A Beveridge slab beam squeezed by its own waffle pods
An internal beam pinched below its 110mm width by a waffle pod, found at a Beveridge pre-pour. What the beam does and why the day before the pour matters.
What our inspectors are finding on Beveridge jobs, written up as we go.
One of our inspectors will call you back. If it is urgent, email hello@buildinginspectionsbeveridgemelbourne.com.au.

An internal beam pinched below its 110mm width by a waffle pod, found at a Beveridge pre-pour. What the beam does and why the day before the pour matters.

Heating ducts crimped at lock-up, bent tight at handover and found disconnected in the roof. Three Beveridge findings on the same system nobody sees.
Instant online pricing, or email the booking team at hello@buildinginspectionsbeveridgemelbourne.com.au.